For public transportation company RET in Rotterdam, eReM has replaced a great part of the track switch heating panels. Climate issues led to problems in the past. eReM was asked to come up with a solution and this resulted in an improved design, justified by several heat calculations. The outdated system was disassembled and divised in two different panels. If possible, the components were re-used. The project was phased out and completed in a very short time, in order to be ready for the upcoming Winter. We have processed the up-to-date drawings of the design in the engineering tool EPLAN. These drawings serve as a standard for future panels. The result is a better ventilated system and less track switch failures at various subway tracks in Rotterdam!
“We have processed the up-to-date design in new drawings.”
In order to improve your visit to our website, we make use of cookies. With these cookies, we collect and analyze anonymous user data. You can read more about this topic in our Privacy Statement.