At a new Heineken brewery in Mexico, eReM has built, designed and installed the control and power flow system for the compressed air supply. It concerned a green field brewery in Mexico, Meoqui, Chihuahua. The system was created, based on a DCS system with PLC, that controls four compressors and one air dryer. eReM was responsible for the panel building, the software and for installing the entire installation as well. The compressors have also been wired and installed by our installation department. Next, a connection had to be made with the existing production process. The first beer cans are in production and the production of bottles will follow!
“A big installation project, including panel building and software. ”
Optimizing and extanding the production and storage capacity. View project
In order to improve your visit to our website, we make use of cookies. With these cookies, we collect and analyze anonymous user data. You can read more about this topic in our Privacy Statement.