Replacement field cabinets

for A producer of chemicals

The order

Replacement field cabinets

For a producer of chemicals, eReM has built and designed new cabinets for controlling the production processes. It concerns 25 sections of control cabinets, a total of 80 panels! The cabinets will be situated in the control room and in several places in the plant. First, our E&I Engineers have processed all drawings into Eplan. Next, our panel builders could start their job. The project is very challenging, because the first part already has to be ready by the end of April 2019. As a supplement, eReM also got the job to build and design 7 additional interposing relais panels.
Cabinets

“The project includes 80 cabinets and 7 interposing relais panels.”